A corridor is not an empty office. Somebody is coming home at four with groceries,
somebody else is moving a couch in at eight in the morning, and the hallway being cleaned
is the only way either of them reaches their door. The schedule matters as much as the
method.
On a forty-unit building we work one floor at a time instead of opening the whole
property at once, so residents always have dry carpet between the elevator and their
suite. Truck-mount extraction does the lifting: the machine stays in the van, heat and
vacuum hold steady down a long corridor, and recovery is strong enough that traffic lanes
are typically walkable in three to six hours under optimal drying conditions*. Rotovac
rotary heads go where a wand cannot pull hard enough, which on strata work is almost
always the elevator lobby and the first stretch inside the front doors.
Early mornings, evenings and weekends are normal for us, and most councils pick their
quietest window rather than the cheapest one. Tell us when the building would rather not
see us, and we will work around it.
*Dry times are conditional. Once we finish, we recommend running fans, ceiling fans,
heat, and extraction fans for the full 3–6 hour dry window.